'Specify automation options' is available to location where the category used for max-in-a-row is the same as the category for either the high, medium, or low priority workloads.
In addition to "All shifts', the options include the shifts corresponding to the high priority workload and the category in a row.
Starting with an empty schedule, run the automation and choose an option.
The shifts will be assigned based on the relation model. The 'Evening Shifts' or 'Weekend Shifts' pre-scheduled in this way can be locked using the 'lock' option in the automation option screen. After the evening or weekend shifts are pre-scheduled, the rest of the schedule can be automated.